Atco’s Peigan Trail Feeder is a portion of the overall Urban Pipeline Replacement project moving all high pressure pipelines from residential areas to the Transportation Utility Corridor. VSC’s scope of work was to install over 3000 metres of 610mm x 7.1 GR 359 ERW CAT 11 pipe in the Peigan Trail Right of Way from 25th Street SE to the east side of 52nd Street SE. This installation included crossing one rail spur line using HDD for a total length of 166 meters and a major road crossing using the same method over a distance of 90 meters. Currently this pipe will be operating at 70 psig. Although currently intermediate pressure, this pipeline was constructed to function as a high pressure pipeline in the future.

 

 